Powering a Water Treatment Plant and Retirement Village
One of our 200kW BESS units paired with a 150kVA generator is supporting a water treatment plant and new residential retirement village, reducing diesel runtime, noise and emissions while maintaining reliable temporary power.
Project Snapshot
Key Outcomes
This project experienced the following results:
Diesel Runtime Saved Monthly
Monthly reduction in generator runtime
Diesel Saved
Monthly fuel reduction compared with traditional generator-only operation
CO2 emissions avoided
Reduced carbon output for the month
Silent Operation
Improved conditions for site and nearby residents
What It Powered
Project Summary
One of our 200kW BESS units paired with a 150kVA generator is supporting a water treatment plant and a new residential retirement village with reliable temporary power.
By combining battery storage with generator backup, the system reduces dependence on continuous diesel operation while maintaining stable site power.
The project achieved meaningful diesel, emissions and noise reductions, showing how GeneRent can support critical infrastructure and nearby residential environments with a quieter, more efficient rental power setup.
This system provides 20 hours of silent operation, improving noise conditions for the site and surrounding residential owners.
Technical Details
Before / After
Continuous diesel generator operation
BESS-supported generator operation
Higher fuel consumption
7,777L of diesel saved
Higher emissions
20.22T of CO2 emissions avoided
Generator noise
20 hours of silent operation
Reduce Diesel Runtime With A Smarter Rental Power Setup
Looking to reduce diesel runtime, emissions and site noise? GeneRent can design a smarter rental power setup using BESS and generator integration.
