Smart BESS Deployment – Construction Project

August 2024

A new installation combining a 100kW Battery Energy Storage System (BESS) and 200kVA generator has transformed operations at a growing residential development in Pimpama:

  • Reduced diesel run time from 24 hoursa day to just 2 hrs 40 mins per day
  • Cut diesel usage from 3,864L per week to 418L per week
  • Lowered diesel costs from $7,728 per week to $836 per week
  • Massive reduction in CO2 – 8,959.6kg per week
  • 21 hrs of pure silence per day
  • Eliminated light loading issues during off-peak times

Previously running on 24-hour prime power, the system now operates with outstanding efficiency!