One of our 30kVA Hybrid units was recently deployed to replace a traditional 40kVA generator on a major hospital project. With real-time monitoring and efficient energy control, we’ve achieved:

This system provided 21 hours of silent operation, improving conditions for site and neighbours.

One of our 100kW BESS paired with a 100kVA generator is currently delivering impressive results on a Brisbane hospital project. This clean energy system powers essential site services while significantly lowering operating costs and emissions:

Beyond the numbers, this setup is providing power for essential site facilities being lunch rooms, meeting spaces, offices, first aid stations, eye wash stations, toilets, and water stations.

After just two months of operation, our 20kVA Hybrid unit is delivering measurable results for one of Australia’s leading construction companies. Based on monitored data from October:

Tracking through our live monitoring system ensured accurate, real-time feedback for the client and confirmed their monthly savings.

A new installation combining a 100kW Battery Energy Storage System (BESS) and 200kVA generator has transformed operations at a growing residential development in Pimpama:

Previously running on 24-hour prime power, the system now operates with outstanding efficiency!